Description:
In April 2017, work was carried out to strengthen the foundation soil using URETEK DEEP INJECTION. The concrete floors were lifted up to 8 cm at maximum by SLAB LIFTING injection.
The area of the work area is 10,000 m2. Work on strengthening the foundation soil and lifting the floor slabs was carried out during 40 days without stopping the logistics processes at the warehouse.